SuperFocus Instructions (Third Revision)

Posted: 2011-02-7 14:20

As I have previously mentioned, I have been experimenting with some further changes to the SuperFocus rules. These have been performing extremely well, so I am releasing them now. Please note these do make some considerable changes to the system as follows:

1) Unfinished tasks are now re-entered in Column 2 of the following page and not the same page.

2) Column 2 must always be cleared before moving on to the next page.

3) Once Column 2 of a page is filled, everything remaining on that page must be cleared the next time it is worked on.

 

THE NEW RULES:


Normal AF1 rules, except:

1. There is a second column (Column 2) on each page. This is used for adding additional tasks to pages as follows:

  a. Re-entering unfinished tasks. These are entered in Column 2 of the following page. If you are currently on the last page, then the following page is the first active page of the list.

  b. Entering tasks which you want to do urgently. These are entered on the current page.

2. Column 2 is treated as a part of the page along with Column 1, with the difference that all tasks in Column 2 must be actioned before moving on to the next page. No unactioned tasks may be left in Column 2.

3. Unfinished tasks are always re-entered in Column 2, even on the last page.

4. Once Column 2 is full, no further tasks may be entered on that page.

5. The following page for re-entry purposes means the next page which has any room left in Column 2. When you are currently on the last page, the following page is the first active page of the list. Similarly when entering urgent tasks, if column 2 of the current page is full the tasks are entered on the next page with room.

6. If no tasks are done in Column 1 during a visit to a page, all remaining tasks in Column 1 are dismissed. This rule does not apply to the last page of the list.

7. When you visit a page which is full (i.e. has no space left in Column 2), all tasks on that page must be actioned or dismissed.

Signs and symbols

a. When a task has been actioned, it is crossed out with a horizontal line.

b. When a task is dismissed it is highlighted.

c. When a dismissed task is reviewed and either reinstated or removed altogether, it is crossed out as it is no longer subject to review.

d. A page which has no active tasks left on it is marked with a cross in the outside upper corner.

e. When there are no active tasks left on any previous pages, the cross is surrounded with a circle.

f. When there are no dismissed tasks still subject to review on any previous pages, the circle is highlighted.

 

Conclusion:

The aim of these rule changes is to increase the flow of the system by no longer re-entering unfinished tasks on the same page. At the same time additional pressure is brought to bear to keep working on unfinished tasks. Once a task has been entered in Column 2 it must remain in Column 2 on every page until it is finished.

The new rule about what happens when the page is full is intended to encourage sensible use of Column 2. It is vital to the whole procedure, that one is clear in one’s own mind when a task is finished, and this needs to be defined carefully.

I will be publishing consolidated rules for those not acquainted with previous versions shortly.

French Version (pdf)


Comments (109)

David Coyer - 2011-02-7 15:35
Thanks for the updated information. An observation and then some questions:

First, in your rules, you have no rule 3 and two rule 6. [Thanks, David, corrected! - mf]

When you say "When you visit a page which is full (i.e. has no space left in Column 2), all tasks on that page must be actioned or dismissed.", I see this as a fairly major change to AF1 rules which specify you must do something on at least one task on a page, even if it's full, in order to prevent the remaining tasks from being dismissed. It appears that now you must finish all tasks on a full page in order to prevent those tasks from being dismissed. Am I reading that correctly?
Kudos - 2011-02-7 16:17
Wow, finally the wait is over!

It sounds very ingenious - thanks Mark! :)
FocusGuy. - 2011-02-7 16:21
Hurray !!!! Thanks for releasing the rules. I thought you were attending finishing war and peace so even you read quiet quickly i imagined this in the fifteen next days !!!!!!
So thank you very much indeed. I apply it immediately and will give you the result asap

Best regards

Jupiter.
Tijl Kindt - 2011-02-7 16:22
Haha, you cheater... Posting the instructions before you finished War & Peace ;). Nah, just kidding. I'm sure many people will be happy you posted them, especially after Marcus already gave an important part of the new rules away in his own little variation.

I take it that recurring tasks are just added like any other new task (i.e. in column 1 of the last page)?
Tijl Kindt - 2011-02-7 16:22
Haha, you cheater... Posting the instructions before you finished War & Peace ;). Nah, just kidding. I'm sure many people will be happy you posted them, especially after Marcus already gave an important part of the new rules away in his own little variation.

I take it that recurring tasks are just added like any other new task (i.e. in column 1 of the last page)?
UMOarsman - 2011-02-7 16:24
Mark - so if I understand this correctly, these revisions to SuperFocus dismisses reoccurring tasks until it is time to take action on them once again, correct? For example, if I have a weekly reoccurring task "clean bathroom", it would be actioned to completion, re-entered into the second column of the following page, and 'dismissed' when that second page was actioned.
Alan Baljeu - 2011-02-7 16:38
"all tasks in Column 2 must be actioned before moving on to the next page. No unactioned tasks may be left in Column 2."

If I understand correctly, once you start something, you are not allowed to leave it behind, so every page you must work on it. So if "Read War and Peace" is your written task, you must each SF page actually read some more War and Peace. Is this correct?

Based on the above, I expect you actually enter "Read one chapter" so you can occasionally escape the book.
Mark Forster - 2011-02-7 17:02
David:

<< Am I reading that correctly? >>

Yes, you are.
Mark Forster - 2011-02-7 17:03
Tijl:

<< I take it that recurring tasks are just added like any other new task (i.e. in column 1 of the last page)? >>

Yes, that's correct. As long as they've been finished of course.
Mark Forster - 2011-02-7 17:09
UMOarsman:

<< if I have a weekly reoccurring task "clean bathroom", it would be actioned to completion, re-entered into the second column of the following page, and 'dismissed' when that second page was actioned. >>

No, recurring tasks are treated like any other tasks, i.e. entered at the end of the list in Column 1. Only unfinished or urgent tasks are entered in Column 2.

In the case of a weekly recurring task, you would probably not want to re-enter it immediately anyway.

I'll be writing some more detailed guidance (not rules!) on how to treat different types of task.
Alison Reeves - 2011-02-7 17:13
Thank you Mark.
Mark Forster - 2011-02-7 17:16
Alan:

<< If I understand correctly, once you start something, you are not allowed to leave it behind>>

Yes, you understand this correctly. In the case of War and Peace I did treat it as one long task, so I've been reading some every page of the list. This was the only task I've treated this way, otherwise I'd have slowed progress on other things too much (and fallen very quickly foul of Rule 7).

You are also correct in saying that I could have phrased the task by chapter, or by number of pages read, or even "Read a bit of W&P". Careful definition of tasks is important.
nuntym - 2011-02-7 17:29
+Ad Jesum Per Mariam+

Thank you Mark for releasing SFv.3 early ^__^ I'm implementing it immediately.

Aside from the changing of the rules, I think what you posted last is a big change: "Careful definition of tasks is important."

In the original AF1 instructions, you posted: "DO include plenty of creative tasks such as “Think about…”, “Investigate…”; “Discuss…”; “Review…”" By their nature, these action verbs are very vague. So now in SFv.3 do you discourage these?

Also, if I understand your instructions correctly, now in even the last page Column 2 can and should be used?

God bless!
UMOarsman - 2011-02-7 17:32
Thanks for the quick reply and early release of the rules, Mark! I'm exited to try this out.
vegheadjones - 2011-02-7 18:10
Hi,

I've been using SAF for a while now and really liking it. My only problem has that I did not get through the pages quickly as I was always adding unfinished (and important) work to column 2. The new rule of putting these tasks on column 2 of the following page should really make a difference!
Ephi - 2011-02-7 18:13
"If you are currently on the last page, then the following page is the first active page of the list"

Isn't it the last active page? Isn't the first page always the first page without a cross in the upper left hand corner?
Seraphim - 2011-02-7 18:25
Mark, it seems like the way you've treated War and Peace could be the equivalent of the DITA "current initiative".
nuntym - 2011-02-7 18:39
+Ad Jesum Per Mariam+

@Ephi

<>

This refers to the re-entering of unfinished items. Rule 5 states that the re-entering of unfinished tasks is in Column 2 of the following page. If you are already working on the last page of your list, then you re-enter your unfinished tasks on the FIRST active page of your list.

God bless!
DS - 2011-02-7 18:47
This is nice! I've got a page staring at me, with a few tasks that I've put off for quite a while. And according to the rules, I can't turn the page! And by gum, I'm doing the tasks!

I know previous AF's have had some of this prodding built-in, but the "can't turn the page" rule really makes you work!
Christian - 2011-02-7 19:08
I've been away from the AF/SF scene for a while, but have been looking for this new revised system for a while. AF1 was good, and not too difficult to implement electronically (on my Android phone), but I'd love to hear some suggestions for implementing Superfocus on a smartphone. I'm specifically interested in the part concerning the second column. Otherwise I'd have to "experiment" with paper again ;)
Ephi - 2011-02-7 19:15
Scenario:
On my last page (say page #12) I have column 1 not full.
I have column 2 full.
I need to reenter an unfinished task so I turn to the next page (page #13) and put it in column 2.
I think of a new task.
Do I put it in coulmn 1 of page #12 or page #13?
Mark Forster - 2011-02-7 19:22
Ephi:

The answer is that if you've got column 2 full before column 1 is full, you have a serious problem.
Ryan - 2011-02-7 19:25
Could you elaborate on Rule 6: "If no tasks are done in Column 1 during a visit to a page, all remaining tasks in Column 1 are dismissed."?

Does that mean if I complete all the tasks in column 2 of a page and not work on any from column one, I should dismiss the tasks in column one?
Ephi - 2011-02-7 19:32
Ok,
I'm going to give this a whirl. I have a moleskine pocket notebook (24 lines/page)
I'll use the facing page as "column 2"
All lines are currently full with tasks on my first page.
Sabrina - 2011-02-7 19:49
<< 6. If no tasks are done in Column 1 during a visit to a page, all remaining tasks in Column 1 are dismissed. >>

Does this apply to the last page (the page you are currently writing tasks on) ? According to AF1 rules, this rule would not apply.

Thank you for posting the SFv3 system!
Mark Forster - 2011-02-7 22:15
Ryan:

<< Does that mean if I complete all the tasks in column 2 of a page and not work on any from column one, I should dismiss the tasks in column one? >>

Yes, that's exactly what it means.
Mark Forster - 2011-02-7 22:17
Sabrina:

<< Does this apply to the last page (the page you are currently writing tasks on) ? According to AF1 rules, this rule would not apply. >>

You are right. It does not apply to the last page. I've amended the rule to make this clear. Thanks for bringing this up.
Jen - 2011-02-7 22:28
You said this was working very well for goals like fitness. Do you treat "go for walk" as a recurrent task or a finished task when it's done? (Meaning, if a 30 minute walk is "finished" for you, do you then enter it in the first column when you're done walking?)

Thank you so much for trying these systems out in your own life!
Lech - 2011-02-7 22:30
Mark,

One piece of info is missing AFAIAC.

You come to the new page. Which column do you start first?

I reckon the URGENT i.e. second one, but I can see no specific wording of this rule.

Or am I missing anything?

Regards

Lech
Mark Forster - 2011-02-7 22:53
Ryan:

<< Does that mean if I complete all the tasks in column 2 of a page and not work on any from column one, I should dismiss the tasks in column one? >>

Yes.
Mark Forster - 2011-02-7 22:54
Lech:

<< Which column do you start first? >

You start the page always with column 1.

Until at least one task is added to column 1 in the new page, urgent tasks would continue to be added to column 2 of the old page. Unfinished tasks would be re-entered on the first active page of the list.
Mark Forster - 2011-02-7 23:03
Jen:

<< Do you treat "go for walk" as a recurrent task or a finished task when it's done? >>

I'll be posting an article soon on various ways of dealing with tasks. But the way I actually dealt with my walking goal of at least three times a week was not to re-enter it at all, but to put it directly into Column 2 on those days on which I intended to take a walk. That way it had to get done!
Mike C - 2011-02-7 23:43
Hi Mark,
I am interested in how the testing process might have affected the outcome.

in the testing phase, did the fact that it was a test affect the rate at which you read War and Peace - did you read more at each sitting than you would otherwise have done, because you had made the success or failure of the whole process rest on your completing it, and declared that publicly in this forum?
For example you could read just one page of it for each notebook page, and take three years or so to complete it.

In general I don't usually have external pressure for book reading and some other tasks, and these are the ones I struggle with. Or is it a case of once you get started doing it, you find you want to do it for longer anyway, and it completes therefore in a more reasonable time? I keep looking at that copy of Atlas Shrugged (645k words) that I was given as a ( tongue in cheek) Christmas present..

Anyway thanks for publishing the details of new programme, I'll definitely be trying it.
Mark Forster - 2011-02-7 23:53
Mike C:

I'm sure the testing process did affect the result to some extent. On the other hand I don't think any other system would have worked so well - and some would have failed completely.
Scott Hutchins - 2011-02-8 1:37
So, if there is something you know you need to do next Monday (or at least not before then), would you put it on your calendar and then transfer to SAF when you reach that day?
Scott Hutchins - 2011-02-8 2:27
Just found the answer to my question in another post.
FocusGuy. - 2011-02-8 4:07
I wonder, imagine you Have 2 pages.

Question about urgent and unfinished :
- I have a new urgent task even if i am on page 2 it goes on column 2 page 1 right ?

[No, urgent tasks go on the CURRENT page. If you are on page 2, it would therefore go in column 2 of page 2, Though unless it is very urgent you would probably put it in column 1 as there is still space]

SO i do it but it is unfinished (ie finish doing something on project X) Then it goes on page 2 column 2 right ?

[No, unfinished tasks go on the FOLLOWING page. Page 1 is the following page of the last page, so if it's unfinished it will go in page 1, column 2.]

- Now if this unfinished task becomes again urgent, I understand it is crossed on page 2 column 2 and goes again on column 2 page one. This is what I would naturally do. Am I right ? OR do I have to let it on column 2 p2 as urgent but unfinished ?

[If it's become urgent again it will go in Column 2 of the CURRENT page, i.e. the page you are currently working on, whatever that is]

Thanks for this new system. I just finished to report my list and work an hour on it. I notice the system encourage dismissing things, working on urgent and do it but i dont see the effect about unfinished task which are most of the time important but not urgent.

[Make sure you are doing it properly. Your example leads me to believe you may not be. Make sure you read the rules again and are clear about the difference between the ways urgent and unfinished tasks are treated]

But what is urgent ? Some thing I must do in the day or the week ? If it is a real urgency then it must be done for yesterday (LOL) or the very soon as possible which would be for me within the 3 next days. ? Mark what is urgent for you ?

[Anything which I either can't or don't want to leave until it is reached in the normal course of working column 1]

Last question I love the parenthesis you use at the beginning of task to group task which are finished or reported. Do you still use this system ? I guess yes...

[Yes, it appeared in the picture I put of my SF notebook a few days ago.]
OhNiners - 2011-02-8 4:30
Jupiter:

"Now if this unfinished task becomes again urgent, I understand it is crossed on page 2 column 2 and goes again on column 2 page one. "

From my understanding of the rules, yes, anytime you feel a task is urgent, you can write it in column2 of the current page (I suppose crossing it out in column 2 of the next page is your choice, I would also do that).
FocusGuy. - 2011-02-8 4:30
Other question let say I am attending an answer of someone it must be followed ie i made a call or i sent a proposal does it go on the unfinished task ie in my previous exemple in page 2 column 2 as UNFINISHED ? or does it go on colum 1 where there is some place P1 or 2 ?
OhNiners - 2011-02-8 4:35
So basically Column 2's purpose is to address the 2 longstanding issues with AF1:

1. More emphasis on finishing tasks that need more than one pass to complete.
(Previously you would have to re-write your unfinished task all the way at the end and go through page after page to get to it. In my opinion this was the single flaw of AF1).

2. Allowance for urgent tasks.
(Though for me, the "common sense" rule was sufficient in AF1).

Awesome. These changes should indeed make AF1 "complete".
FocusGuy. - 2011-02-8 4:58
Lets say now I have 3 pages
Column 1 is full on page 1, and half full on page 2 (urgent)
Column 2 is half full on page 1 but full on page 2 (unfinished
then a new task happen it is again an unfinished does it go on page 3 column 2 as unfinished
A m I right ?
JD - 2011-02-8 5:14
Until the process becomes a habit, this could be a list of the "must-do's" or best practices when visiting a page:

1. Must action all items in Column 2;
2. Must action at least one item in Column 1 or risk dismissal (except if you're on last page);
3. If column 2 is full, must action all or dismiss all items.
JD - 2011-02-8 6:25
Actually, what I just said is simply restating Mark's opening paragraphs to the new rules.. :) I have them next to my AF list till the process becomes automatic. Thanks Mark for this! The early release was a real bonus.
Andyc - 2011-02-8 8:01
First, many thanks Mark for posting.

Probably still have a number of questions but one that i havent seen addressed yet is th treatment of 'waiting for' items. How do you deal with these? Presumably as a new item, rather than as an unfinished item?
Mark Forster - 2011-02-8 9:55
Jupiter:

<< I wonder, imagine you Have 2 pages. >>

To avoid having to copy your entire post, I've put my answers in square brackets on the original post above.
Mark Forster - 2011-02-8 10:10
Jupiter:

<< Other question let say I am attending an answer of someone it must be followed ie i made a call or i sent a proposal does it go on the unfinished task ie in my previous exemple in page 2 column 2 as UNFINISHED ? or does it go on colum 1 where there is some place P1 or 2 ? >>

You've taken all the action possible for the time being, so the task is finished as far as the system is concerned. Follow-ups are treated as new tasks.
Mark Forster - 2011-02-8 10:12
OhNiners:

<< More emphasis on finishing tasks that need more than one pass to complete. >>

It's a bit more than just emphasis. The system forces you to finish tasks once you've started them.
Mark Forster - 2011-02-8 10:18
Jupiter:

<Column 1 is full on page 1, and half full on page 2 (urgent)
Column 2 is half full on page 1 but full on page 2 (unfinished
then a new task happen it is again an unfinished does it go on page 3 column 2 as unfinished
A m I right ? >>

No.

The new task would be initially entered on the last page, which in this case is page 3. If it's then worked on but not finished it will be re-entered on the following page, which in the case of the last page is page 1. So it goes in column 2 of page 1.

Jupiter, please read the rules again carefully.
Mark Forster - 2011-02-8 10:20
Andyc:

<< one that i havent seen addressed yet is th treatment of 'waiting for' items. How do you deal with these? >>

See my answer to Jupiter, three above.
FocusGuy. - 2011-02-8 11:16
Ok I did not catch the rules. So I gona work on it, learn the rules, and do it again still it is ok
Thanks again for the answers Mark.
Erik - 2011-02-8 12:38
Jupiter, I'm a native French speaker.
So if you feel the need to pinpoint the specifics of the rules,
maybe we can help each other understand them.
FocusGuy. - 2011-02-8 13:00
Tout à fait d'accord Eric c'est pas simple et je serais ravis d'echanger avec toi.
A tu un email ou un pseudo skype ?
Margaret1 - 2011-02-8 13:17
Mark, thanks for the instructions - it's great to get them now instead of in a couple of weeks. I started using the new system today, and immediately came up with a query. However, reading through my post before submitting it, I started to see things in a different way, and realise that if I'd just followed the rules as you wrote them, the query wouldn't have arisen. I decided I would post it anyway so that you can correct me if I'm wrong, and it may be helpful to someone else.

I think where I was going wrong was in thinking that I had to stay on the same page all day because it would take more or less all day to complete the items in columnn 2. I thought I had to stay on the same page till all the items in column 2 were COMPLETE, rather than until all the items in column 2 had been WORKED ON.

I now realise that if I follow the rules I SHOULD cross off the task I've worked on and if it's unfinished, re-enter it in column 2 of the following page, then work on the next task that stands out, and if it's still unfinished, re-enter it on colunn 2 of the following page. Then when all of the items in the current column 2 have been re-entered or completed, and nothing else on the page stands out, move to the next page, where all my urgent unfinished tasks will be waiting faithfully for me in column 2, and get to work on that. It means I'll probably whizz through all 9 pages of my list quite quickly (I'm using the list I had previously rather than starting a new list today).


HERE IS THE ORIGINAL POST I DRAFTED:
I have 6 items in column 2 of the page I'm processing. They are not urgent in the sense that they need to be done right this minute, but they all need to be completed by the end of the day.

My Column 2 is as follows:

Post query to MF website (that's what I'm doing now!)
Write cheque for window-cleaner
Write and post letter to C
Preps for appointment tomorrow
House ready for guests
Shop and cook for guests

The first three items are things that I will be able to bring to completion in one go.
The last three items each consist of about 10 individual tasks, and for each one I am keeping a separate list outside SuperFocus - if I didn't my column 2 would be filled up with all these individual tasks on one visit to the page.

When I work on these multi-step items, it won't be possible (or sensible) to bring any ot them to completion in one go, because some of the individual tasks within them are time-sensitive. As I work through the page, when I come to one of the multi-step items and it stands out, I intend to spend about half-an-hour on it (or as long as I feel like), then move on to the next item that stands out, and spend half-an-hour on that (or if it's one of the short items, do it to completion), and so on. So I will be rotating through the items in column 1 and column 2 in this way until all the column 2 items are complete, and nothing in column 1 stands out, and I then move on to the next active page.

My query is this: after I've worked for 'as long as I wish' on one of the items that consists of multiple tasks, and knowing that it's still not finished to completion, should I cross out the item and re-enter it at the end of my current column 2 on this page? I feel that this would result in running out of space in column 2. The other option would be to do the crossing out of the item only once it was completely finished. However, if I followed the rules, I would have to re-enter the unfinished tasks on colunn 2 of the following page, and wouldn't be 'allowed' to go there till I'd completed all the tasks on the current column 2.
END OF ORIGINAL POST

Mark, thanks for your patience - I'm sure you'll need plenty of that in the next few weeks, answering all our queries.

P.S. I've spent about an hour on this post that could no doubt have been better spent on actually working my SuperFocus list, whereas if I'd just followed the rules, I'd have made some progress on my urgent tasks - a valuable lesson for me! Happy days!

Best wishes.
FocusGuy. - 2011-02-8 13:47
I think i got it for urgent tasks but there is still a point which is not clear for me about the unfinished task. May be the translation I do about it.

Well I have 2 pages. I am now working on page number 2.
I have an unfinished task. I now I have to report it on the following page.
For me the following will be page number one (if it is free) So it goes on page 1 column 1 unless it is urgent and will stay on column 2 page 2

So now lets do the contrary
If I am on page number one something is unfinished then it goes on column 2 page 2 unless it is urgent and it will go on columN 2 page one.

Please can you confirm this ? It is driving me nut !

Thank you.
Mark Forster - 2011-02-8 13:49
Erik et Jupiter:

<< Tout à fait d'accord Eric c'est pas simple et je serais ravis d'echanger avec toi.
A tu un email ou un pseudo skype ? >>

Si vous avez des questions que vous voulez poser en francais, je ferais de mon mieux a repondre.
Mark Forster - 2011-02-8 13:54
Jupiter:

<< Well I have 2 pages. I am now working on page number 2.
I have an unfinished task. I now I have to report it on the following page.
For me the following will be page number one (if it is free) So it goes on page 1 column 1 unless it is urgent and will stay on column 2 page 2 >>

Not quite. If it's unfinished it will go in page 1 column 2, not column 1.

<< If I am on page number one something is unfinished then it goes on column 2 page 2 unless it is urgent and it will go on columN 2 page one. >>

Yes, that's correct.
Mark Forster - 2011-02-8 14:09
Margaret1:

Your present understanding is correct.

However although you are working within the rules, you are not doing it the way I personally would have done it.

As I understand it you put all the following tasks into column 2 of your current page:

Post query to MF website
Write cheque for window-cleaner
Write and post letter to C
Preps for appointment tomorrow
House ready for guests
Shop and cook for guests

There are several problems associated with doing it that way, including:

- taking up a large amount of column 2
- not being able to move on to the next page until you've done some work on all six tasks
- having to use subsidiary lists

The way I would have done it is to put all the tasks (including those in the subsidiary lists) on the last page as new tasks. Then I would have moved them a few at a time (starting with the most urgent) into col 2 of whatever page I was currently on. The advantages of doing it that way are:

- don't take up so much of col 2 on one page.
- can move more rapidly through the list
- can pick my order to work on the tasks instead of having to be working on all of them
- don't have to use subsidiary lists
- may get to some of the tasks in the normal way of working
FocusGuy. - 2011-02-8 14:09
Ouf, ça commence à venir Merci !
Margaret1 - 2011-02-8 14:42
Thanks ever so much, Mark! My first reaction to your suggestion was that it would feel like 'cheating' to dip in and out of the last page(s), cherry-picking tasks to bring forward to column 2 but I realise that's just silly. I'll give it a go and let you know how I get on.
DaveP - 2011-02-8 14:57
Mark,

In your test, specifically what was your criteria for having no backlog.?

Dave

PS - So far system is working well.
Mark Forster - 2011-02-8 15:21
Margaret1:

<< it would feel like 'cheating' to dip in and out of the last page(s), cherry-picking tasks to bring forward to column 2 >>

Not really because column 2 is designed for urgent tasks. Although you wanted to get all those tasks done that day, they weren't all urgent in the sense that they needed to be done while you were working on the current page.
Mark Forster - 2011-02-8 15:24
DaveP:

A backlog is when you are having to clear old material as well as dealing with new material. It's usually caused by not processing incoming material or tasks as quickly as they are arriving/ falling due.

My specific criteria was that I was up-to-date with email, paper, phone calls and current with all my active projects.
Ephi - 2011-02-8 15:31
Scenario:
On my last page (say page #12) I have column 1 not full.
I need to reenter an unfinished task so I turn to the next page (page #13) and put it in column 2.
I think of a new task.
Do I put it in coulmn 1 of page #12 or page #13?
Seraphim - 2011-02-8 15:35
Question - I am just starting out, and have a few items on Page 1 Column 1. I worked on one of those items for a bit. It is unfinished, and I need to re-enter it. There is no "next page" yet, so I am just going to enter it into the same page, Column 2. Is that correct?
Mark Forster - 2011-02-8 15:45
Ephi:

<< On my last page (say page #12) I have column 1 not full. I need to reenter an unfinished task so I turn to the next page (page #13) and put it in column 2. >>

No, if you are on the last page you re-enter unfinished tasks on the first active page, i.e. at the beginning of the active list.

<< I think of a new task.Do I put it in coulmn 1 of page #12 or page #13? >>

There is no page #13 yet.
Mark Forster - 2011-02-8 15:47
Seraphim:

<>

Yes. Congratulations on having not enough tasks to fill one page - is this a record??
Ephi - 2011-02-8 15:51
Mark:
<>

But rule 1a says
"a. Re-entering unfinished tasks. These are entered in Column 2 of the *following* page."
Ephi - 2011-02-8 16:12
I think I see where my misunderstanding is. The usage of "following page" is confusing in the rules.
"1) Unfinished tasks are now re-entered in Column 2 of the following page and not the same page."
This is not always true as Seraphim just pointed out.

"a. Re-entering unfinished tasks. These are entered in Column 2 of the following page. If you are currently on the last page, then the following page is the first active page of the list."
This last sentence implies that you turn over and start a new page (which becomes the first active page) which is not your intention. Rule 5 has the same ambiguity.

I think it would be more clear if you replace the phrase "following page" with "next active page"
Margaret1 - 2011-02-8 18:05
Hi Mark - I'm pleased to report I'm almost finished all 6 items I'd listed, having used the method you suggested. I spent most of the afternoon on page 1, actioning column 2 and then adding items that felt ready to be done into column 2 from the end of the list. Nothing from column 1 on page 1 stood out because I wanted to work on items pulled into column 2 from the end of the list.

The end of the list (although it's not the end now because quite a few items have been added) still contains things that have to be done today, but can't be done yet (e.g. because a phonecall has to be made at a specific time). When they are available to be done, I'll move them to column 2 of whichever page I'm on, but in the meantime I'll carry on to the next active page.

I'm really enjoying the excitement of trying a new system.
Seraphim - 2011-02-8 19:29
Mark:

LOL! Yes, it's a record for the time being, and a very unusual experience for me. I don't expect it to last very long. :-)
roland - 2011-02-8 21:31
it would be great to have a 2 minute video on the new system.

thank you,
Scott Hutchins - 2011-02-8 23:10
"The way I would have done it is to put all the tasks (including those in the subsidiary lists) on the last page as new tasks. Then I would have moved them a few at a time (starting with the most urgent) into col 2 of whatever page I was currently on"

Mark -

Not sure I'm following you here. If something must be done today, and I put it in column one, I would fear that I may not be flagged to finish it today. Shouldn't these types of things all go to column two of the current page as soon as you add them?
Scott Hutchins - 2011-02-8 23:15
Mark -

You talk about the advantage of not using subsidiary lists above. I believe you have suggested in other posts that having project info/task lists separate from AF. Is your perspective different with SF? Thanks.
Mark Forster - 2011-02-9 0:36
Ephi:

<< But rule 1a says
"a. Re-entering unfinished tasks. These are entered in Column 2 of the *following* page." >>

You've left half the rule out. It then goes on to say:

"If you are currently on the last page, then the following page is the first active page of the list. "
Mark Forster - 2011-02-9 0:39
Ephi:

<< Re-entering unfinished tasks. These are entered in Column 2 of the following page. If you are currently on the last page, then the following page is the first active page of the list."
This last sentence implies that you turn over and start a new page (which becomes the first active page) which is not your intention. Rule 5 has the same ambiguity. >>

I'm sorry, I don't think there's any ambiguity. How could an empty page at the end of the list be the beginning of the list?

The obvious and correct meaning is that when you reach the end of the list, you circulate through the list again from the beginning.
Mark Forster - 2011-02-9 0:49
Margaret:

<< I'm really enjoying the excitement of trying a new system. >>

Great to hear it went well for you today.
Mark Forster - 2011-02-9 0:52
Scott:

<< Not sure I'm following you here. If something must be done today, and I put it in column one, I would fear that I may not be flagged to finish it today. Shouldn't these types of things all go to column two of the current page as soon as you add them? >>

Just because something needs to be done today doesn't mean it needs to go in Column 2. In the normal course of events you would expect to circulate through the whole list at least once a day. It's only when you begin to think they are not going to get done in the normal course of events that you need to put them in Column 2.
Mark Forster - 2011-02-9 0:55
Scott:

<< You talk about the advantage of not using subsidiary lists above. I believe you have suggested in other posts that having project info/task lists separate from AF. Is your perspective different with SF? Thanks. >>

No, the only reason Margaret put them in subsidiary lists was because she didn't want to take up too much room in Column 2. There may be good reasons one might want to have subsidiary lists, but that wasn't one of them in this particular case.
Erik - 2011-02-9 1:40
@Jupiter

Skype: sources.jp
Email: erik@sources.jp
Schedule: http://tungle.me/sources


@Mark
Merci beaucoup pour l'invitation d'échanger en Français :)
Pour ma part, je n'ai pas de questions.
Mais je vais tenter (je ne promet rien) de faire une traduction des règles en Français.

Je voulais faire un vidéo sur Auto-Focus il y a quelques mois mais j'ai eu des empêchements. Que diriez-vous d'un vidéo sur SFv.3?
Alan Baljeu - 2011-02-9 2:30
Impeachments! I hope not the American variety! :-)
Stever Robbins - 2011-02-9 4:08
I think I may be a bit unclear on what constitutes a "finished" or "unfinished" task. For a large task like "Create my website" in column 2, the task is finished and re-entered in column 1 of the last page when I've completed all the work I want to do today. If I work on it for a few minutes but don't get as much done as I want to for today, then it goes in column 2 of the next page. Is my understanding correct?

Second question: what if an old page has a column 2 that's full of crossed-out tasks from things that had been urgent on previous days. When I get to that page, does column 2 count as "full" for purposes of rules 4 and 7? Or does the definition of "Full" mean that column 2 is completely taken up with things that are urgent that I've added today?
Mark Forster - 2011-02-9 8:20
Erik:

<< je vais tenter (je ne promet rien) de faire une traduction des règles en Français. >>

Excellent!

<< Que diriez-vous d'un vidéo sur SFv.3? >>

Je suis en train de produire un video, mais si vous voulez produire un autre je serai tres reconnaissant.
Mark Forster - 2011-02-9 8:31
Stever:

<< For a large task like "Create my website" in column 2, the task is finished and re-entered in column 1 of the last page when I've completed all the work I want to do today. If I work on it for a few minutes but don't get as much done as I want to for today, then it goes in column 2 of the next page. Is my understanding correct? >>

Yes, it's basically up to you to decide when a task is finished. It's also up to you to be clear in your own mind before you begin, what "finished" means for that particular task. There are many ways to tackle larger tasks, which I will be covering soon in a post, The key thing is to keep the number of tasks in column 2 under close control so that it does not fill up too soon.

<< what if an old page has a column 2 that's full of crossed-out tasks from things that had been urgent on previous days. When I get to that page, does column 2 count as "full" for purposes of rules 4 and 7? >>

Yes, that's exactly what it means.

<< Or does the definition of "Full" mean that column 2 is completely taken up with things that are urgent that I've added today? >>

No, and it's important that you don't flood column 2 with "urgent" stuff that isn't really urgent.

Column 2 acts as a sort of regulator for the entire system. It forces one to finish what one has started, and allows one to get on with stuff that needs doing now - but at the same time it prevents these things blocking all the other tasks that need doing.
Alan Baljeu - 2011-02-9 11:37
To be clear, if I pick up a non-urgent item to do a little because it's easy, I may put it away to the back page instead of cluttering the active column?
FocusGuy. - 2011-02-9 12:19
Just a feet back Superfocus is incredible. There are some rules I dont still understand and I am not at all easy at all with them. I notice that the others are not easy themselves with them too ! LOL. So for theses I feel exactly like in the London smog.

My real problem is about the different option about unfinished task. But for the moment the balance beetween urgent tasks and normal tasks works indeed well with me.
because the rest is clear for me I mean URGENT TASK for example.

I am impatient about the video the one of Mark of course but also if you do one Erick may be you could do it in French I will post it on my blog. And also about a real summury about the real rules of Superfocus V3 grouping the rules of AF1, SF2 and the specific characteristics of SF3

For my own culture i would be interested to understand why Mark you decided a specific treatment of the unfinished task with differents options depending on beeing or not on the last active page.
wowi - 2011-02-9 12:52
@Jupiter,

I do not really understand where you see the difference: Assume you have 3 pages, the you cycle through them 1 - 2 -3 - 1 -2 -3 -1 - 2 - 3. That means, the following page of 3 is page 1.

Now you have the rule to put an unfinished task in the second column of the following page. That means: if you are on page 1, put it on column2 of page 2, if you are on page 2, put it on c2 of p3, and if you on page 3, put it in c2 of p1.

Wolfgang
Alain - 2011-02-9 12:52
Dear All

Superfocus is amazing. Thanks!
In my job, i have very often to deal with an interlocutor at phone and thus, i have to speak with him or to action all the tasks and projects related to him.
Thus, i have to bypass the usual way of AF to action tasks dispersed through all the pages
What is the best way to deal with?
sorting in one shot all the related tasks from all the pages and report the urgent one to the usual column2 of the next page ? It seems to be important to put in front of the line the "project or the intelocutor" to have a quick access to the related tasks while with the interlocutor.
it would be not really compatible with the superfocus way of "naturally" deal with priorities?

Sorry for my English, i'm French.
Mark Forster - 2011-02-9 13:22
Alan:

<< To be clear, if I pick up a non-urgent item to do a little because it's easy, I may put it away to the back page instead of cluttering the active column? >>

If the task is "Do a little work on X", yes.

If the task is "Do X", no.
Mark Forster - 2011-02-9 13:26
Jupiter:

<< you decided a specific treatment of the unfinished task with differents options depending on beeing or not on the last active page. >>

There aren't any different options.

An unfinished task is always re-entered on the following page. As Wowi says, if you have three pages 1-2-3 and you are circulating round the pages in the normal SF/AF manner, the page following 3 is 1.
Scott Hutchins - 2011-02-9 13:31
Alain -

I've started entering notes in the front of my notebook and actions in the back. Notes include "project pages" (search this forum for further discussion). My action list will say the name of the project and the page number...and the notes page will have the detailed task list. This is helpful when you have bigger projects that include multiple tasks that are currently active.

The same holds for your agendas issue. I have a notes page for each of my employees. It lists their projects (upcoming, active, complete) and any items I want to discuss with them the next time we speak. You could do this as well. Refer to the notes pages when you meet with the person. If you need to actively seek out a meeting, add it to your SF list. My groceries list is similar. I write items on a separate list as they come up, but I only enter BUY GROCERIES when that is ready to be actioned. At the store, I reference the separate list.
Mark Forster - 2011-02-9 13:35
Alain:

<< In my job, i have very often to deal with an interlocutor at phone and thus, i have to speak with him or to action all the tasks and projects related to him.>>

The way I would handle this myself would be to look through my list and then write all the points I wished to talk to him about on a separate sheet of paper. Once the call was ended, I'd cross of the list any tasks which had been completed. Tasks which still needed some action I'd leave where they were.
FocusGuy. - 2011-02-9 16:30
ah ! it's much better. Now I understand unfinished and urgent. Many thanks indeed Wowi and Mark/

@Alain "deal with interlocutors" I do the same that mark. I have 3 or 4 people I speak 3 times a day with. I just a a separate sheet for them and collect everything on it. It let me un forget all I have to speak with them.
Michael - 2011-02-9 18:38
Dear Mark,

Could you please post the updated and complete version of the rules of the SFv3, rather than listing of the differences/updates to the previous version as it is right now?

Thanks,
Michael
Mark Forster - 2011-02-9 18:55
Michael:

I'm in the process of writing them right now.
FocusGuy. - 2011-02-9 20:26
As promised here is my return about superfocus 3

Even If I still struggle a bit with the rules the systems is indeed incredible with me.

Advantage
- Excellent feeling of control. I believe in the sytem. It came naturaly with me as AF1 and AF4.
- Excellent intuition because of the system. I felt yesterday night I had to to make a call at 10 PM. The decision was right. It saved a crucial business situation. I understand why. Because, I felts confident with the system and peacefull, my brain made the right decision at the right time (even it was late).
- Addiction with the system YES ! I like it so much like AF1. It is the same addiction.
- Good progressing with the unfinished task (Thanks you so much again for the explanation of UBI and MF ie "An unfinished task is always re-entered on the following page. As Wowi says, if you have three pages 1-2-3 and you are circulating round the pages in the normal SF/AF manner, the page following 3 is 1" It is simple now It is simple a cycle 123, 312, 231 ..."
- Excellent control about the urgent tasks the rule seems simple. Urgent goes on column 2 of the page I am working on am i right ? And urgent is something i must not quit until having done it exept if it is too long too do and i am fed up to do it.... Is it ok ?
- For me i use a little paper pocket note book 110 cm - 170 cm it is perfect 32/33 ligned tasks per page so i love it and I can have it everywhere with me. I hope i wont loose it.

Inconvenient
- Lot of difficulties of applying the rules. I had many difficulties with the unfinished.
- Dismissing is hard with me. Some tasks little by little are crossed but not highlined for the moment. But I never really understand dismissing. I hope there will be some explanation about this cause it is not still clear with me.
- It took me 2 days to be operational. I finally rewrite my last list because I prefered to go on a clean list.
- Some difficulties with the new tasks I still wonder when i think about an urgent task where do i put it ? I apology this point has bee stipulated somewhere.... But where ?
- Now inconvenient for the moment. Still AF1, then AF4 no system gave me more pleasure than this and i am so please to deal with a new system.

Statistic 33 tasks per column
3 actives pages
P1 C1 (full) 33 tasks (16 crossed) - C2 24 tasks (19 crossed)
P2 C1 (full) 32 tasks (17 crossed) C2 16 tasks (5 crossed)
P3 C1 (2/3 full) 23 tasks (3 crossed) C2 2 tasks
Free of back logs yes but i cheated i rewrite the list
Dissmissed tasks none P 1 there are 4 tasks lefts on 24 tasks...
Ready for dissmissing p1 C1 ? May be see that soon !!!!

Oh I love it !
Mark Forster - 2011-02-9 21:16
Jupiter:

<< And urgent is something i must not quit until having done it exept if it is too long too do and i am fed up to do it.... Is it ok ? >>

If you don't finish it, then it should be re-entered in Column 2 of the following page, like any other unfinished task.

<< Dismissing is hard with me. Some tasks little by little are crossed but not highlined for the moment. >>

That's the wrong way round. They should be highlighted first (which means they are no longer active), then crossed out when they are no longer subject to review (either because they have been reinstated or because you have decided not to do them at all).

<< But I never really understand dismissing. I hope there will be some explanation about this cause it is not still clear with me. >>

It's difficult to answer this without knowing what it is that you don't understand about dismissing. Is it that you don't understand what dismissing is? or what the purpose of it is? or what the rules are for when to do it?

<< I still wonder when i think about an urgent task where do i put it ? I apology this point has bee stipulated somewhere.... But where ? >>

You put it in Column 2 of the page you are currently working on. That's so you can start work on it quickly.
TomL - 2011-02-10 3:33
I tried various forms of Autofocus previously but it never quite did what I needed my system to do. I thought I'd share my initial impressions from a few days use.

I just started with SF3 and found myself happily building my list and saying to myself "oh, that is urgent" and "oh that is urgent too". By the end of the day yesterday, I suddenly found myself with 5 pages of tasks and way too many Urgent things in column 2 on page 1. A sinking feeling came over me as I realized those things I considered Urgent were actually several days worth of work and I would never get off of page 1. I also realized that I had tremendous resistance to some of the things Iisted in col 2.

I thought to myself that this couldn't possibly be what Mark intended, I must have missed something. I thought about just crossing things off the list and moving them back to the end of the list as I couldn't cope with that much "Urgent" stuff, but realized that if I was going to do that I might as well not use the system at all. I would feel it was ok to "cheat" and as sneaky as as my mind can be about procrastination, I couldn't give in so easily.

So I went back and looked at column 2 on page 1 and tried to figure out how I could both honor the sense of urgency that compelled me to put the thing in column 2 and overcome the resistance to some of the items listed. In the end it was as simple as following the rules as written. Rule 2 to the rescue.

Actioning the task in this case was clarifying the urgency and ensuring I had properly identified an action to work on rather than just chucking a big hairy project onto the list. Once I completed this I was able to treat some items as unfinished and move them to the next page's col 2. Others felt complete once I did the thinking and spawned clearer, more detailed actions that could be added to the end of the list in Col 1 on my last page. At the end only a brief list of actionable tasks remained in Col 2 and were quickly dispatched.

Problem solved, no mental gymnastics or "tweaks" required. The forcing functions of completing Col 2 and working on or dismissing items on full pages seems to be extraordinarily effective. The things going onto the list are a lot crisper. If something ambiguous gets on the list, eventually you have to deal with it and that forces one to engage with the things one might otherwise avoid in other systems.

Simple, and elegant, well done Mark! Thank you very much!
Mark Forster - 2011-02-10 9:54
TomL:

Yes, one of the great advantages I have found with this system is that it actually forces you to think about what you are doing!
FocusGuy. - 2011-02-10 12:51
Idem ! The system force me to think about what i am doing and sometime i realized that i did something i wouldnt do for it make me loosing time ! Well done Mark !
box - 2011-02-10 14:29
Hi Mark,

I got 2 questions:
1. Sometimes an urgent task in column 2 may become not urgent. How to deal with this situation?
2. Sometimes some tasks in column 1 become useless. But if it's not the time according to your instructions to dismiss them because I just finished one task in column 1, may I dismiss them anyway? Or should I wait to the step 6?

Thanks,
Box
Mark Forster - 2011-02-10 14:37
Box:

<< 1. Sometimes an urgent task in column 2 may become not urgent. How to deal with this situation? >>

This shouldn't happen too often as since the idea behind putting the task in Column 2 is that you will do it quickly - so it shouldn't have much time to become non-urgent in! But if for example your boss says "I don't need that report now until the end of next week", you can just cross out the task and re-enter it at the end of the list.

<< 2. Sometimes some tasks in column 1 become useless. But if it's not the time according to your instructions to dismiss them because I just finished one task in column 1, may I dismiss them anyway? Or should I wait to the step 6? >>

You can delete any task at any time if you decide you are not going to do it at all. This is not the same as dismissing a task, because a dismissed task is still up for review.
2mc - 2011-02-10 16:34
Mark,

You wrote in response to Ephi:

>The answer is that if you've got column 2 full before column 1 is full, you have a serious problem.<

That isn't a very helpful answer. Could you elaborate?

I've read your instructions and I'm trying to envision whether or not to try it. I see two problems – one of which is the same problem that Ephi mentioned.

My first problem is that it involves a LOT of rewriting. That's going to be a burden for me to overcome.

Secondly, I have many urgent tasks and many unfinished tasks because of my liberal use of the little-and-often principle. My re-entered unfinished tasks outpace my entry of new tasks. And, when you add in the rewriting of already entered tasks that have now become urgent, then that is a lot of column 2 tasks.

So, knowing that to be true, I have the same concern as Ephi. I can envision the processing reaching the point he mentioned. Could you please address this concern?

Thanks.

Matt
Mark Forster - 2011-02-10 17:20
2mc:

<< If you've got column 2 full before column 1 is full, you have a serious problem. >>

You have a serious problem because the system won't work if that is the case.

<< My first problem is that it involves a LOT of rewriting. >>

It doesn't involve any more rewriting than any other version of DIT/AF/DWM etc.

<< My re-entered unfinished tasks outpace my entry of new tasks. >>

Does your re-entry of unfinished tasks outpace your entry of new tasks plus recurring tasks? If it does the system will only work for you if you adjust the number of unfinished and urgent tasks. You would have to adjust the number a lot, because to work the system properly you should be able to visit a page four or five times before Column 2 is full.

You can adjust the number of unfinished tasks by defining many of your tasks so that they can be finished in one go.

You can adjust the number of urgent tasks by redefining what you mean by urgent, i.e. instead of "a task I must do today" to "a task I must do in the next hour".

If you are not willing or able to do this, then SuperFocus is not for you.
2mc - 2011-02-10 17:43
Thanks, Mark.

> It doesn't involve any more rewriting than any other version of DIT/AF/DWM etc.<

I respectfully submit that it does, though perhaps not by much. Tasks already existing in the list have to be rewritten into column 2 when they become urgent. This is a new feature not found in other AFs.

I actually think this version is very clever. It really appears you have plugged a lot of the holes of your other AF versions. I commend you on it.

I think my multitude of self-directed work projects will prevent me from using this method, unless I separate out my project tasks and just identify the project name as a task. I can foresee a couple of problems with that, but I will defer mention of them until I try it. I think I will finish my experiment on my latest revision of AF1 that doesn't have any rewriting first.

Anyway, thanks for the answer.

Matt
2mc - 2011-02-10 17:44
Mark,

What is the rule for starting the next day? Do you start on the same page you were on when you finished the prior day? Or, something else?

Matt
Mark Forster - 2011-02-10 17:52
2mc:

<< I respectfully submit that it does, though perhaps not by much. Tasks already existing in the list have to be rewritten into column 2 when they become urgent. >>

Yes, this is true. Though my experience is that this only happens quite rarely. Most genuinely urgent tasks get put directly into Column 2.

<< Do you start on the same page you were on when you finished the prior day? >>

Yes, you start again where you left off.
Walter - 2011-02-10 20:27
Hi,

I am french and this is my 1st post.
I tried AF1, AF2, DWM, SAF and finally chose AF1.

I have been testing SF3 on both personal and professional lists for 3 days.
Flow is good, SF3 seems really promising and I have a question for you.

This afternoon I was working on my current page (as there was still unactionned items in column 2) but I had to action 7 urgent items in the following page. Thus I broke one rule. It is allowed?
Michael K - 2011-04-9 9:51
Mark,

You made this comment back in February that confused me a bit:
"But the way I actually dealt with my walking goal of at least three times a week was not to re-enter it at all, but to put it directly into Column 2 on those days on which I intended to take a walk. That way it had to get done! "

Did you mean that you would put it in pages ahead? This would imply that pages correlated to calendar days, which I hadn't seen mentioned in any of the "Focus" styled systems. DIT or DWM, yes but AFx or SF, no.

-OR- did you simply mean that on the day you intend to walk, you put that task in column 2 of whatever your current page happens to be... I think this is what you must have meant.

I have a strong affinity to your systems that include a time factor - what can get done in a day. Then my "to-do" list (or in DIT "will do" list) is also a sort of journal of "did-do"'s... This is useful in a review when I would ask myself a question like: "So what’s been better since we spoke yesterday?" ;)

Anyway, I was hoping you'd clear up that ambiguity about your daily walk entries and if you have any advice about 'dealing with the day', I'd be interested in hearing it.

Thanks,
Michael
Mark Forster - 2011-04-9 10:30
Michael:

I meant that on the day I intend to walk I put the task in Column 2 of whatever my current page happens to be.